This is the first expressway in Vietnam built according to international standards. The starting point of the route is located on the ring road 3 of Hanoi, 1,025 m from the abutment north of Thanh Tri bridge , the end point is Dinh Vu dam, Hai An district ( Hai Phong ). The part through Hanoi is 6 km long, the section through Hung Yen is 26 km long, the part through Hai Duong is 40 km long, the part through Hai Phong is 33 km long
Project Name: High t snail H à N ội – H Pass Ph Mr.
Total investment: 24,566 billion VND.
Investor: Vietnam Infrastructure Development and Financial Investment Corporation (VIDIFI).
Contractor: Vidifi Concrete Joint Stock Company, Huy Ha Construction Service Company Limited, Namkwang Engineering and Construction Company Limited, Traffic Construction Construction Corporation 4, Bridge Construction One Member Limited Company 75.
Beta provides products: waterproofing the bridge surface, drainage plastic pipe system, osmosis pipe, trash screen, manhole cover, plastic separator, impact resistant dock …
Time: 2011 – 2015