Expressway Hanoi – Lao Cai is 264 km long, with the starting point being the intersection between Highway 2 and the highway North Thang Long – Noi Bai (Hanoi) and the ending point is Quang Kim commune (Bat Xat district, Lao province). Cai). This highway is part of the Xuyen Asia AH14 road.
Project name: Noi Bai – Lao Cai Expressway Project Total investment: 20,000 billion VND Investor: Vietnam Expressway Development Investment Corporation (VEC) Contractor: Traffic Traffic Construction Corporation 4, Thang Long Construction Corporation, Posco E&C Co., Ltd., Quang Tay Bridge and Road Co., Ltd., Vinaconex E&C Construction and Engineering Investment Joint Stock Company, Doosan Heavy Industry and Construction Co., Ltd.
BETA is the contractor of civil box culverts, sewer box culverts, drainage system in package A8. At the same time is a supplier of expansion joints; Waterproofing substances on bridges and culverts; Bridge railing; Drainage plastic pipe.