  • Bac Giang – Lang Son Expressway

    Bac Giang – City Expressway Construction Investment Project Lang Son, section Km45 + 100 – Km108 + 500, combining with strengthening the road surface of NH1, section Km1 + 800 – Km106 + 500, Bac Giang province and Lang Son province, shall be implemented by BOT contract. Regarding the expressway component, the starting point of the project is Km45 + 100 (intersecting NH1, Sao Mai, Chi Lang, Lang Son); the end point is Km108 + 500, connecting with the end point of the NH1 upgrading and expanding project, section Hanoi – Bac Giang. The total length of the expressway is 63,86km. Regarding component NH1, the starting point is at Km1 + 800, at Huu Nghi and Lang Son border-gate areas; the end point is at Km112 + 038.84 (Ly route QL1), in Tan Dinh commune, Bac Giang. The total length of the whole route is 110.2km. The project was started in March 2016 by the investor of BOT Bac Giang Lang Son Joint Stock Company. Project progress is currently being accelerated, the 105km enhancement component on NH1, section Km1 + 800 – Km106 + 500, has basically been completed up to now. It is expected that by the end of 2019, the 64km new construction component will end and open the entire route by the beginning of 2020. The project has a total investment of 12,189 billion VND, which is especially important in serving economic development economic, increased connectivity with your home country China, is expected by locals and the whole country.

    PROJECT INFORMATION

    Name of project:  Construction of Bac Giang – Lang Son expressway, section Km45 + 100 – Km108 + 500
    Type, grade of project:  Traffic works, grade I
    Total investment : 12,189 billion VND
    Implementation time : 2016 – 2019
    Place of execution:  Bac Giang and Lang Son
    Group Deo charge:  General contractor managing the main package of bridge, duongTruc continued construction of one section of the bridge, road, traffic safety, lighting
    company Beta provided reinforcement materials for Geocell talus roof, bridge surface osmosis drainage system, cast iron trash rack, bridge surface waterproofing materials …